COMPLETED projects  
 
 
   
  Sterling Snow Drop, Frazer Town, Off Hennur Road
 
 
 
 
 
 
Structure

RCC framed structure designed as per relevant BIS codes, structural efficient system implemented.

Plastering

Waterproof Sponge finish for external walls and all internal walls will be Plaster of Paris punning work.

Walls

External Walls with 6" solid blocks and internal walls with 4" solid blocks.

Doors/Windows

Main door frame (6*3) of wood. Main door will be of 30mm flush door with cladding on both sides paneled with teak veneer/membrane finished totally 40mm thick and polished if required, all door/window frames (3*5) will be of wood, window shutters of honne wood/UPVC windows and flush doors of 30 mm with membrane finish on both sides for bedroom and bathroom doors.

Flooring

Living/ dining/ bedrooms will be provided with vitrified tiles flooring (2*2) of premium quality with skirting. Kitchen will be provided with ceramic anti-skid tiles with skirting all round. Balcony will be provided with anti-skid ceramic tiles.

Kitchen

Kitchen platform with 20 mm granite top with bull nosing and stainless-steel sink with drain board, glazed tiles dado up to 2 ft height.

Plumbing

For internal & external water lines, CPVC pipes will be used of make and all PVC pipes will be used of reputed brand. Each bathroom and kitchen will be provided with separate concealed valve for maintenance. Points in the bathrooms will be provided are for diverters and overhead shower, hot & cold for wash, basin and points required for commode & health faucet & geyser point will be provided. Kitchen sink will be provided with hot & cold mixer. Provision for geyser & aqua guard. Utility area will be provided with points for washing vessels & washing machine.

Toilets

Anti-skid ceramic tiles for flooring and glazed ceramic tiles dado up to 7 ft height for walls bifurcating dry and wet areas - all CP fittings will be of good make. All ceramnic fittings will be of reputed brand or equivalent with wall hung closets with basins wherever possible. Sanitary lines in toilets and bathrooms will be through core cutting and not sunken slabs. False ceiling will be done.

Water Proofing

Water Proofing will be done for terrace area and for all bathrooms & Utilities. Bathrooms will be chemically treated after water proofing.

Paintings

Tractor emulsion for internal walls, apex for external walls and enamel paints for doors, windows grills & railings externally. Internally all doors & windows will be polished.

Electrical

Concealed copper wiring along with modular switches of reputed make. All rooms/living will be provided with AC, Wi-Fi and TV points & living will be provided with telephone point with adequate light, fan, geyser and power points.

Water

Adequate usage of water supply through borewell, subject to availability and Corporation drinking water, large capacity sump tank and overhead tanks separated for borewell and Cauvery along with automatic water level controllers will be provided.

Common Area

Staircase will be laid with solid flooring; M.S. fabricated railings will be provided. Intercom will be provided for each flat, common toilet for watchman and maids at parking level will be provided with a security room.

Lift

4 persons automatic elevator of reputed make will be provided